水帘喷漆室工作原理:The water curtain spray chamber working principle
工作时,水泵连续向溢流槽供水,使水溢流,在水帘板上形成瀑布状的水帘。供风机组将空气从室体顶部将新鲜空气均匀送入,排风机通过水帘与室体形成的通路从水帘下部将操作区的被污染的空气吸走,从而保证喷室内空气循环流动。喷漆时,一部分过喷的漆雾碰到水帘板的水帘上,被水冲至储水槽内,没被捕捉的漆雾随顶部吹下的气流经过水帘板下部在漆雾洗涤装置内与水雾充分混合洗涤,气流内形成的混合了漆雾的较大的液滴经挡水板阻挡,绝大部分回到储水槽内,剩余的废气再经活性炭充分过滤,洁净的空气经排气管路进入大气。
When the pump work, continuous water supply the water to overflow, overflow, the water curtain waterfall shaped curtain in the board. Air . Air supply unit will air from the top of the chamber body evenly into the fresh air channel, exhaust fan formed by water and the chamber body will operate from the lower part of the water polluted air is sucked, so as to ensure the indoor air circulation flow injection. When painting, a part of paint mist sprayed with water curtain plate, washed into the water tank, not captured paint mist with air top blowing through the water screen plate at the lower part of the paint spray washing device and washing water is fully mixed, the airflow formed mixed the paint mist larger drop the water retaining plate barrier, the vast majority of back to the water tank, the remaining waste gas by activated carbon to filter, clean air through the exhaust pipe into the atmosphere.